Duration: 2004 - 2005
Project features:
1) advanced technology featured reliability, practicability and evident benefit, rational and smooth process, advanced level equipments of similar foreign pellet plant;
2) advanced and practical control system for guarantee of fast capacity achievement;
3) comprehensive control of safety and environment to comply with local standards;
4) energy saving technology for proper utilization;
5) engineering optimization based on existing auxiliary utilities to reduce project cost;
6) without impact on nomral production