PROJECT NEWS

BACK No.1 2350m? BF of Cangzhou Zongheng Iron & Steel Complex Contracted by Sinosteel MECC Successfully Achieved Target Production
RELEASE TIME:2009-03-23 SHARE:


On March.18, 2009, the utilization coefficient of No.1 2350m3 BF reached 2.34 t/d?m3, i.e. daily production of 5500 tons, exceeding the target BF coefficient of 2.3 t/d?m3 in the EPC contract and designed evaluating performance index of 5405 tons Fe daily output.

Since The No.1 2350m3 BF was put into production on Sept.16, 2009, technicians and engineers form Sinosteel MECC have making fully effort on this project, ensuring the successful target production achievement, which displays the engineering and managing capacity on EPC projects of Sinosteel MECC, and further solid the brand image of Sinosteel Group in both domestic and oversea market.



Beijing ICP No.11020457 Technical support : zc-yd