Duration: 2001 - 2003
Scope:2x380m3 blast furnaces(No. 1 &2),450m3 blast furnace(No.3)
Technical Features:
3 pebble hot blast stoves, hot air temperature 1100~1150℃;
Combustion air and BF as for preheating;
Centrally-fed BLT for top charging;Raw material: 80% sinter, 20% pellet and lump.