REFERENCE HIGHLIGHTS

BACK 120t Converter Primary Dedusting Renovation for Rockcheck, China
SHARE:


Duration:2015 - 2016


Project profile:the three 120t converters have been in operation for 10 years and can't meet the requirement of emission limit of no more than 50mg/m3. The original primary wet dedusting system is upgraded to dry to elevate the emission performance.


Scope: EPC of three dry dedusting devices


Technical Data: dust content of flue gas is 20mg/Nm3; dust content of recycled gas before gas holder is ≤10mg/Nmwith pressure of 3000Pa±100Pa and temperature 70



Beijing ICP No.11020457 Technical support : zc-yd