Customer: Lampung, Indonesia
Capacity: 2x7MW,two sets of N7-3.43+QFW-7.5-2 type condensing steam turbines and two sets of XG-40/3.82-M type chain grate boilers with thrower
Scope: EP
Duration: 2011-2013
Previous:30MW Waste Heat Recovery for Tubatse in South Africa
Next:NO MORE