REFERENCE HIGHLIGHTS

BACK Fangchenggang Steel Base Long Product Project
SHARE:

Customer: Guangxi Liuzhou Iron & Steel Group


Capacity: 3.5mtpa, 3 high speed wire rod mills, 2 high speed bar mills, 2 bar mills


Scope: EPC


Duration: 2018-2020


Highlight: world’s first long product rolling project uniting 7 lines that are constructed simultaneously and smoothly put into operation, employs Sinosteel E&T’s self-developed long product rolling technology and RVM modular mill applicable for TCMP process of high-speed wire rod and bar;

Max. speed of Φ6.0mm is 110m/s;

Max. speed of Φ8.0mm coiled rebar is 95m/s;

Max. speed of Φ10.0mm coiled rebar is 70.5m/s.


Beijing ICP No.11020457 Technical support : zc-yd