1.5MT Stamping Coke Oven Battery with By-product Plant (EP) for JSW Steel Limited
Customer name: JSW Steel Ltd, India Construction period: 26 months Contracting scope: Design & Engineering, Equipment supply, Supervision for civil work,erection,commissioning and heatint-up, Production operation guidance for one year
Main technical characteristics......
1.3 MT Top-charge Coke Oven Project (EP) for ISDEMIR, Turkey
This project includes 2 x 65 ovens, 6m Coke Oven Batteries with capacity of 650,000 ton per year each. The project was successfully put into production in November 2007.
400,000 ton Non-recovery Coke Oven Project (EP) for SISCO, India
Customer name: SISCOL, India Construction period: 30 months Contracting scope: basic engineering design, detail design of coke oven body and supply of main equipment and provides guidance to heating up and operation;Contracting mode: E+P ......
150t/h CDQ for Liuzhou Iron&Steel Corporation
Customer£ºLiuzhou Iron&Steel Corporation Construction Period: Aug, 2006 ¨C Nov, 2007 Contract Scope: Design, Civil work, Equipment supply and installation, Commission, Put into production;Contracting type: EPC......
FirstPreNextLast To
Page
Total 6 ¡¡¡¡
The 1/
2Page