| 3050m3 BF (EP) for ISDEMIR, Turkey |  |
|
| Customer: ISDEMIR, TUREKY; Construction period: 2005-2009; Scope of contract: all the system of BF, not including pig casting machine and TRT system...... |
|
| 3¡Á2350 m3 BF (EPC) for Cangzhou Zongheng Industries Limited |  |
|
| Customer: CEM Construction period: No.1 BF: June 2007--June 2008, No.2 BF: May 2008¡ªJune 2009, No.3 BF: January 2008¡ªFebruary 2009...... |
|
| 2¡Á450m3¡¢530m3 BF for Xingcheng Special Steel Plant |  |
|
| Customer: Jiangyin Xingcheng special steel co., ltd
Construction period: No.1 BF: November 2001¡ªSeptember 2002, 10 month, No.2 BF: February 2002¡ªSeptember 2002, 7 month, No.3 BF: January 2005¡ªJanuary 2006, 12 month......
|
|
| 2 x 450 m3 BF (EPC) for Honghe Steel Plant of Kunming Iron & Steel Corporation |  |
|
| | The project was started from 2005, and one BF was successfully put into production in the same year, and the other BF was successfully put into production in 2006...... |
|
|