Customer: Shiheng Special Steel Co., Ltd.
Capacity: 2x265㎡ sintering machines, 24mtpa totally closed intelligent raw material yard
Scope: EPC
Duration: 2019-2020
Highlights: coefficient is 1.415t/h·㎡; waste heat boiler steam is no less than 100kg/t-s; power consumption is no more than 36Wh/t