REFERENCE HIGHLIGHTS

BACK 2x265㎡ Sintering Project for Shiheng Special Steel, China
SHARE:


Customer: Shiheng Special Steel Co., Ltd.


Capacity: 2x265㎡ sintering machines, 24mtpa totally closed intelligent raw material yard


Scope: EPC


Duration: 2019-2020


Highlights: coefficient is 1.415t/h·㎡; waste heat boiler steam is no less than 100kg/t-s; power consumption is no more than 36Wh/t

Beijing ICP No.11020457 Technical support : zc-yd