On February 6 of 2016, the JSW 650m3 Blast Furnace Expansion and Overhaul Project contracted by SINOSTEEL MECC was successfully put into production on schedule, after completing installation and commissioning work within the planned blowing-down period.
The smooth production of this project further deepens the long-term cooperation relationship between SINOSTEEL MECC and JSW, and reinforces good basis for contracting future JSW projects.