Duration: 2009 - 2010
Main technical features:
output: 3.8mtpa 6 ~ 150mm cold sinter feed
utilization factor: 1.3t/m2.h
main system operation rate: 93%
sinter machine: 360m2
sinter pallet: 1500×4000×700mm
circular cooler: 396m2
material layer thickness: 700mm
Project features:
record of shortest construction duration of sinter projects of comparable capacity; rational process help realize smallest land occupation of sinter plant of same scale, which is only 6.88×104m2 (including preserved desulfurization facility). 4 fields were adopted for all electrostic precipitators to achieve smallest fume emission index.