Recently, the new pre-straightener project, participated by Sinosteel MECC, for the 5-meter heavy plate rolling mill of Minmetals Yingkou Medium Plate Co., Ltd. started operation.
Criitical auto-control system supply
The 5-meter heavy plate rolling mill originally supplied by SMS was equipped with the most advanced auto-control technology. To extend the product lines and raise the added value of products, a pre-straightener must be equipped between finish rolling and direct hardening.
Sinosteel MECC supplied the critical auto-control system for the new pre-straightener project, ensuring the completeness and advancement of the equipment.